Gary Hahn, Emilio C. Piesciorovsky, Raymond Borges Hink, Aaron Werth
Modern electrical grids face growing stability risks from customer-owned generators, especially at points of common couplings (PCCs). Disruptive behavior from power-electronic sources can cause protective relays to isolate problematic generators, making measurement integrity critical. This article presents a distributed ledger technology (DLT) approach that uses smart contracts to evaluate PCC voltage measurements and trigger backup breaker operations. The approach is framed as a verifiable, multi-organization attestation and audit layer, not as a real-time control security mechanism. In the proposed architecture, voltage measurements from a hardware protective relay are anchored on a DLT through the Cyber Grid Guard (CGG) system for attestation by both the grid utility and customer-owned generator. A Voltage Service Limits (VSLs) smart contract evaluates the on-chain measurements against allowable phase-voltage limits derived from the ANSI C84.1 standard. The framework is validated in a hardware-relay-in-the-loop test bed under sustained-undervoltage, sustained-overvoltage, and transient line-to-line fault scenarios. The results show that the VSL smart contract can process these measurements and issue backup breaker actions consistent with the defined service-limit criteria, demonstrating the DLT potential as a verifiable audit layer at the PCC that complements primary protection.
Emilio C. Piesciorovsky, Raymond Borges Hink, Aaron Werth, Gary Hahn · 6 authors
Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small-measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible troubleshooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.