2024 National Teaching Institute Evidence-Based Solutions Abstracts
Abstract
Kimberly DiMaria; C.S. Mott Children’s Hospital, Ann Arbor, MichiganSurvival after in-hospital cardiac arrest is associated with resuscitation team performance and adherence to American Heart Association (AHA) resuscitation algorithms. The primary aim was increased resuscitation team performance during simulation scenarios as evidenced by improved modified Clinical Performance Tool (mCPT) scores. The secondary aim was improved adherence to AHA resuscitation guidelines during actual code events. Process measures, including frequency of simulations, were used to determine proof of concept.In 2021, a review of resuscitation events in the cardiac progressive care unit (CPCU) revealed poor compliance with AHA guidelines. One of the most critical times of code performance in the CPCU is during the initial response, before code team arrival, which prompted development of a simulation intervention that focused on improving team performance during the initial stages of resuscitation. A single-center, prospective, interventional quality improvement project, First 5-Minute Drills, was developed to provide concise, repeated opportunities for CPCU team members to practice low-frequency, high-risk skills, and crisis resource management principles. Team performance during simulations was directly observed and evaluated using an mCPT score, a 20-point scoring tool that measures team performance of 10 different skills. A t test was used to compare mean mCPT scores at 3 periods. Adherence to AHA algorithms during patient codes was assessed via a retrospective review. Patient resuscitations were evaluated using a standardized scorecard comprising 10 evidence-based treatment recommendations embedded within the AHA resuscitation algorithms.Over 19 months, 48 First 5-Minute Drills were conducted and 238 team members participated. The mCPT was administered at various time points during the study, and results demonstrated a 35% improvement in code team performance. There was a statistically significant increase in mCPT scores from 14.3 to 18.3 (P = .02). Pre-post analysis of 4 actual code events demonstrated a 50% improvement in adherence to AHA algorithms. First 5-Minute Drills resulted in improved simulation resuscitation team performance and adherence to AHA algorithms during real-time code events in the CPCU. The low-cost, high-yield First 5-Minute Drills intervention is generalizable to other departments and hospitals.Eunice Santos, Jimmy Nguyen; Cedars-Sinai Medical Center, Los Angeles, CaliforniaThe rate of central line [catheter]–associated bloodstream infections (CLABSIs) with pulmonary arterial catheter (PAC) use is high. In the advanced heart failure unit (AHFU), PAC CLABSIs are associated with increase morbidity, cost, and loss of eligibility for a heart transplant. The goal for this initiative was to determine whether the optimization of a nursing maintenance bundle created in 2018 in the AHFU to reduce PAC CLABSIs sustained fewer than 3 PAC CLABSIs per year for 5 years.In the AHFU, PACs are used for heart transplant evaluation and heart transplant listing. In 2017, there were 10 PAC infections at our institution. Feedback from case reviews for PAC CLABSIs in 2017 showed problems maintaining occlusive dressings in these catheters. In 2018, a quality improvement project was implemented to address challenges associated with PAC maintenance. The project introduced new PAC dressing kits and development of education for nurses caring for PACs in the AHFU. The standard central catheter dressing kit included a single transparent bandage, a chlorhexidine gluconate (CHG) swab, sterile gloves, and tweezers. The new PAC kit included a second anchoring transparent bandage and CHG swab. All the nurses were educated on the use of the PAC dressing kit—specifically the application of 2 transparent bandages to maintain an occlusive dressing, narrow beard clipping, and CHG bathing. In 2021, introduction of weekly central catheter rounds consisted of epidemiology nurse and nursing leadership rounding on patients with PACs. Sustainment of the project included permanent changes in nursing education, dressing kits, and close monitoring by epidemiology nurses and nursing leadership.PAC CLABSI rates were analyzed using the organization’s hospital-acquired infection dashboard from January 2018 to July 2023. Results showed that the PAC nursing maintenance bundle reduced PAC CLABSIs through the 5-year study period. In 2018, the year of implementation, there were 3 PAC CLABSIs in the AHFU. There was 1 PAC CLABSI in the AHFU in each of 2019, 2020, and 2023; there were 2 CLABSIs in 2021. Implementation of the PAC nursing maintenance bundle, multidisciplinary collaborations, continued nursing education, and adherence to the PAC nursing maintenance bundle during the 5-year period accomplished organizational goals in improving CLABSI rates and improving patient outcomes.Isabel Madrigal, Melissa Parodi; Doctors Hospital, Coral Gables, FloridaCentral line [catheter]–associated bloodstream infections (CLABSIs) are among the most common hospital-acquired infections (HAIs). CLABSIs are serious infections that can result in longer hospital length of stay, increased cost, and increased risk for death. In February 2021, the critical care unit (CCU) leadership team reviewed the unit CLABSI rates of 11.33 for the third quarter (Q3) of calendar year 2020 (CY20) and 9.32 for Q4 CY20. The CCU leadership team identified an opportunity to implement an inter-professional quality improvement team.In March 2021, the CLABSI interprofessional quality improvement team met to discuss the current CLABSI rates and review the specific patient cases. The team consisted of nurse leaders, clinical nurses, infection prevention nurses, performance improvement nurses, pharmacists, and In the CCU CLABSI rate was patient The interprofessional quality improvement team CLABSI prevention education for nurses and during the of and 2021. All nursing education evidence-based as catheter and compliance with the central catheter maintenance education consisted of catheter and central catheter were educated to central catheter as a central catheter in the as the as the second as the third and as the CCU leadership team implemented central catheter and real-time for The central catheter consisted of of and dressing The leadership team CLABSI bundle compliance on central catheter were as of the CCU rounds to central catheter The CLABSI rate for through was The intervention resulted in a in CLABSI for that within 5 of a code of of cardiac can to the In 2021, a was implemented to with In this was to to nurses time for practice with and of code in a of the for a quality improvement In simulations and a to and times were developed through a multidisciplinary Feedback from a simulation a nursing development and resulted in the to the simulation to maintain the and our quality improvement project, an education was to the time to included an increase in practice with and the cardiac code to the and of The of the simulation is to practice the to the The simulation is repeated after a simulations, time to was the of the for increased from to from the to second time to during the simulation was time to during the second simulation was improved time to by an of the the time to and from the nursing was to to an in the of in than 5 of this study is to an evidence-based initiative in the care unit to by patients for a heart transplant are by cardiac in the an increase in patients on the heart transplant by of these for with nursing a was and at the were with the and to a each of the unit a on the to The by to are and 1 for the and 1 for the a to our a was as a for heart transplant to and by and other a is and a in the are to on the to for a heart the of for are on the months, patients for a heart transplant. The a rate of patients were to the other with the use of the to and on In to a of the a of to other A of and patients each review was for this of Medical Center, July and February the cardiac care unit central line [catheter]–associated bloodstream infections which was an increase from that in 5 in 2020, in 2021, and in that of nurses in the than 2 of on the the of CLABSIs for the of the the to on to CLABSIs and improving CLABSI by various evidence-based can increase a length of by an of and can and per In the care CLABSIs with to team rounding to reduce of central the for the during were on each to a was are on A dressing was created to were for dressing changes as for patients with chlorhexidine gluconate (CHG) The unit education in In that education can result in a reduced of included dressing changes by the nurses and CHG by the nursing CHG reduce CLABSI to were educated on using A was created to points CLABSI A unit quality which included an of CLABSI was for with than 2 on the was to reduce CLABSIs from in to in 4 CHG treatment compliance improved from to compliance improved in 4 dressing and dressing dressing and and and can used as an to CLABSI rates within our which is 1 the goals for CLABSIs using various evidence-based can reduce in patient length of and improved various to as as to maintain the and project was to standard for hospital-acquired infections and in an care hospital with critical care on patient and are for care line [catheter]–associated bloodstream infections (CLABSIs) and infections are 2 and increased to In the critical care of care continued to an increase in CLABSIs and which the clinical nurse to a analysis and Patient were developed using standard and evidence-based to patient and quality in critical The with the nursing and an interprofessional team to implement and bundle for these specific The nursing a by unit and the implemented standard for CLABSIs and and at the The a to discuss new and an opportunity for the to and provide and CLABSI and and initiative resulted in an in CLABSIs and a in year used the to compliance with a new CLABSI initiative using the was than for the quarter and sustained through Clinical nurses were to a in the use of in with The identified for rounding patients at risk for The evidence-based bundle compliance by standard in a in CLABSIs and The with clinical nurses by education and at the the clinical nurse improved resuscitation quality by evidence-based for resuscitation quality of in resuscitation via the the that a of on 4 of in time to in 2 is the time to of 5 for and of cardiac events of poor the hospital was poor for of and time to The reviewed and implemented evidence-based for improving and In 2018, each was a specific with specific to the of the codes were introduced in to increase and The code was for of and education was with The weekly review of in were the with and the code and code resulted in improved the There was a of and In 2021, the and There were and 5 in 2021, and 1 in and 5 and in of The hospital the for for for the in 4 measures and is on to the for Hospital, was a significant in an care unit at a prevention that the rate was the rate of than The goal was to reduce the rate to than by a new are and patient from The an was in The identified opportunity to the of the Process The included 3 and and the of the the use of 3 and 2 chlorhexidine gluconate that was through a initial was that from the there was a that the of the infection was from an The were in a for The was by and resource nurses for the 3 the nurses on the unit were and were the of the the rate was rate resulted in a for a in and the of the The initial resulted in a The an rate of The results showed that the was in a goal of than The using the that a standardized reduce in patient goal of this evidence-based quality improvement initiative was to the of infection within critical and care a through a of using chlorhexidine gluconate (CHG) for catheter care and bathing. were in the rate of in significant on nursing infection is a common infection and is associated with an catheter in of cases. the evidence-based catheter care bundle and for catheter the of in critical and care that use of CHG for catheter care reduce of significant The for and a for care that CHG for and of the of catheter to the A multidisciplinary team of infection prevention nurses, and quality developed a for CHG that included the of catheter with a CHG A standardized tool was developed and used to for was for in a an and a of in the intervention were reduced by = during the patients on which during the other were in that the increase to in the the the in of and among nurses a CHG catheter care and a intervention to reduce the of Medical Center, care unit new nurses to in caring for a patient and advanced in other nursing care of this project is to increase the of nurses through the and of a care unit that focused on time for new nurses of of for through an 1 of of and of of the that is the are in the of new A that on was the in and through of a from arterial catheter and catheter and were The with a code in a simulation was after each to for and and to showed that increased by a before and after on the in the arterial and demonstrated an increase in and The of increased and were All the this for new nurses by through a Medical Center, the care unit there are from advanced cardiac to advanced cardiac including heart and heart care is for each from advanced and the to in The goal is to increase of nurses during crisis management and to reduce the of code of a of were in and on advanced cardiac in simulation was created to patients in the in scenarios were created and including in a patient with in a patient a heart and a In an a patient with a from patient to and to is are to by as the patient In this on cardiac advanced and from the to most and use before to and were used to included time for of the and showed the of were in and was reduced from to In for practice with that provide a for revealed to with the and scenarios in the Hospital, and implement measures to in patients in the care unit to reduce to increased by in the for of the during year use of is associated with risk of in patients and to permanent loss of our by with for the used at to and a review and to educated on these which included using with a at the to and the the per to the to the of the of the of the to on the the there is than of for 2 nurse and the after 10 for a of to loss of created a for that the time and the compliance with our The was and used to the at analysis from from for of the in there to in the of this with an time of and than compliance with the from are with the measures in the with the and and nurses to to other at of goal of this initiative was to an increased rate of infections by to reduce the catheter standardized in a use and to were through nursing education, and improvement multidisciplinary and use of with risk of to increased morbidity, length of stay, and of of are using with the of prevention of is to for which can result in and The the of the of observed and the of and is used for The is used as a quality improvement by to and compare with and an increase in was hospital to address the using an prevention The included a and of with an leadership implemented a compliance with education to of the and use of the new of revealed a statistically significant in the after of the intervention (P with from before the intervention to the hospital 1 in the after with 4 in the 3 of the intervention for the an risk of Patient nurses are to implement practice changes that the of nursing provide education, and use Medical Center, a for of as that the of by the as a an to of an that the time for of in the to can the of The of the project was to a that this and care for the of in use an identified care unit nurses the modified failure tool each The risk a patient with the score, and on the and the the is in The reviews the patient and patients are identified for of goal of the is to to a from a and that goal met to The implemented at 4 of the is a in patients from to on the of from which the of The and the and of nurses and in the care of the and in the the of for central catheter there was an increased of infections the care team was to and address in care The team used with to implement changes in the prevention of central line [catheter]–associated bloodstream infection included the use of care of dressing application and clinical team by nurses, was to as a resource for and practice opportunities to The on patients with and with and dressings central in our were with to dressing application on of the catheter in of was to the the standard of care to that of central catheters. The the to the to in the of The to discuss the use of use with 3 of our CLABSIs were to catheters. the catheter within 3 maintaining and in practice was through with including unit and the was there a in CLABSI cases. the quarter of there CLABSIs in the there CLABSIs the increased on an increased compliance with maintenance for central and catheters. of resulted in increased and The continued to an of nurses practice Medical Center, goal of this project was to determine the of a care on and and increase in the and of and use of in the care unit are to reduce length of stay, and resource most patients in the for of patients at risk of a for patients met were to a of and poor The for nursing and which are used to and that as a the for of for patients was the and from the organization’s a and on was The nurses an 4 A and test was administered before each of increased from in to in 2023. were to an project The results showed an improvement in and in from and improved to during the study showed that the improved and and The most of opportunity identified were treatment and and Hospital, an nurse catheter infection rates in to increased 3 care application identified an nursing of a for a for a and a of A clinical team was created to address these clinical team clinical nurse and infection prevention was to address the of The team in rounding and infection case reviews and departments to practice improvement included to and use including and unit was used to address catheter and The team with to catheter on with practice by for catheter in the patient The team to of and The catheter was as an management with and and catheter maintenance to catheter use and changes for catheter use were by the nurse and team catheter use from to catheter the patient hospital rates from to infections per catheter A of the is in The on of and evidence-based and clinical of Medical at resuscitation in a reviews code to with the American Heart Association and the of The aim for this quality improvement project was to increase compliance scores on the 5 that are within for 2 the most and after each multidisciplinary team in this reviews resuscitation events and to provide a to risk the from the the 2 that the most improvement included use and Process improvement measures were implemented using the included the of code events with and a for to the 5 risk that code is improvement included a that the and identified by the resuscitation team with members after the at and events. education, including a on the of the and was implemented with for resuscitation events the during year 2023. tool was used to compliance for and for compliance for each of the were reviewed were at the resuscitation including for and each of opportunity were and were to increase the of compliance for use was and for the of improvement measures, the compliance for was and for Hospital, Los Angeles, after is a multidisciplinary to the care of a patient to The of the Los a In March for and within of time were and The goal of the project was to and by at in each clinical nurse the as the tool to use in this A review was conducted with the of the of The and were at with nursing and leadership for and nurses, nursing leaders, and reviewed the and cases. The hospital team was and the in care for patients was as a goal of the unit and these included and The were to nursing and nursing the of was The hospital team conducted reviews of patients and weekly were with nursing and the unit In there were multidisciplinary during which members on the and to the of the the multidisciplinary the of of the and hospital team the team met and sustained the improved and time by than January through the showed significant from to of a project The results the to among in the from hospital to is a for the can is a high-risk and with nurses at the the nurse in patients as for patient for is The aim of this project was to of by a for in the of this project, of as and a the nurse to and a unit identified the for a was and a including unit team and to a for implement this project, was from and the and and the the was to at a education and the was in 5 of the for from unit nurses revealed of a for as of that a patient and quality One that and was the of a in the was time evidence-based practice increase patient is to hospital is to patient to Children’s is the of an which significant to patient In Children’s that rates in care unit the by for Patient patient an team of care was to the were developed through the included standardized for care for and analysis of events. education was through and a the implemented standardized and were introduced for of with patient and of during patient were the of 2 and after each were used to and determine to rates per patient from and to compliance identified and improving patient significant in rates with the the rates to by statistically the (P = and the (P = monitoring and a standardized evaluation of and to the of education, and a of and patient Medical Center, implement and a for patients to and maintenance care A of patients with of is for increased is a common care with failure rates are to of patients at a hospital to used in patients with is associated with increased and patient and reduced with this evidence-based practice a was implemented to care A was developed to and an patients were for before were to use of as a in a is the for increase and patient care of with revealed a significant in to the team and nurse for in fewer per on = = The directly members and with to The in improving test scores increased to a of Melissa for new nurses on in an care unit were and an implemented to critical care nurses during to and nurses a new nurse in this increased by from year to to nurses on during each A increase in nurses to with to a in to with nurse to and using the evidence-based for and to and patient the identified were that of patient and a tool to review was The developed a tool to nurses to to on and to patient The is each and to the nurse to use patient the of each the and and review the the patient on the goals and identified on the of with the are the for the and most of the increased from before the to after the of with the in for increased from before the to after the initiative was a by the to a of new nurses, resulted in a that patient and improved Children’s Hospital, practice using and that are in with is the in the goal is to and to the of an and whether nursing and 2021, was to a of to developed a of 4 that case and skills. The included of and which the in and of 3 and which the in and in of a and and which in of and using and and of which in the of in implementation, management skills, and the of the a was included scores and scores at 3 and and after the scores were on a of 1 to results in the and of the the most improvement in the of and and improved by and points on the from to 3 after the and were sustained at The to in a project increased by in a improved by 1 Implementation and the opportunity for to a study, using analysis to at by the a care new nurse rates were with the of with improving a new nurse was to on and The primary for is the which nurses with to and in are on education that most nurses The of the as to our this is by a are clinical nurse leaders, clinical and are of nursing new that for The the new nurses to and a through clinical time by the new nurses to and a to and The to this and during weekly the year of the our rate improved from 50% to the of continued the second with a rate of is with current as a of as these the new nurses in the new and are The of this the nursing and nurses to the of our Medical Center, Los Angeles, prevention and reduce rates in failure and transplant to risk and after a to including and and a to rate in patients with and of the patients an after team implemented to prevention in patients with with 5 education, a rounding and All focused on failure risk tool was developed and used to quality The tool the use of a assessed and including other and In with the unit nursing practice leadership rates at and a implemented were from the rounding tool the for of members of the care to a nurse nurse and education to patient the 4 rates were than patient July this unit a rounding to the specific risk developed a with 5 to the of each the of and The was implemented by March 2023. year resulted in a in to per patient the rate in the 4 in of Medical Center, quality improvement project implemented a for cardiac to the of patients in than after and the length of care unit with from the year a cardiac was In the study evaluated the of an on improving the of nurses longer times and after cardiac project was conducted with a of was created to patients cardiac The of time to was for each patient from the time of to the to the time of The length of was in A from the year that the was analyzed using and and with the intervention A test was used to determine whether there was a statistically significant patients the and the were by
Community
0 commentsNo discussion yet
Be the first to share a question or observation.